Stainless Steel 304 316 CF8 Bsp NPT Thread Screwed Ball Valve
Product Description
Stainless Steel 304 316 CF8 BSP NPT Thread screwed ball valve
SPECIFICATION
Product Name: Stainless Steel 304 316 CF8 BSP NPT Thread screwed ball valve
Material: Stainless steel ,SS304/CF8, SS316/CF8M,WCB, and so on
British Standard : BS21.0
DIN Standard: DIN2999
American Standard:ASME B1.20.1
ISO Standard: ISO 228-1, ISO7/1
Size: 1/4''-4''
Certificate: ISO9001: 2000,CE
Pressure: 150LB, 1000WOG, PN64
Temperature Range: -20-250 degree C
Application:Applied to stainless steel pipeline system, water system, petrolum system etc
Connection Ends:Socket weld or Threaded: NPT, BSP, BSPT etc.
Suitable medium:Petroleum, chemical, power, gas, water, linepipe, heat exchanger, shipbuilding, construction, high&low pressure pipeline etc.
Features: 1.1000PSI/PN63
2.Full Port
3.Investment Casting
4.Blow out Proof Stem
5.Locking Device Handle(Option)
6.PED97/23/EC(CE0036) Approved
7.Casting Approved Ad2000-W0
8.Thread: ASME B1.20.1, BS21.0, DIN2999/259, ISO 228-1, JIS B0203, ISO 7/1
9.Inspection Testing: API598, EN 12266
Related Type:
1PC BALL VALVE | 2PC BALL VALVE | 2PC BALL VALVE LIGHT DUTY |
2PC BALL VALVE DIN3202 TYPE | 3PC BALL VALVE | 3PC BALL VALVE WITH DIRECT MOUNTING PAD |
3-WAY BALL VALVE ( L & T TYPE) | 2PC FLANGE BALL VALVE ( JIS, ANSI, DIN) | 3PC FLANGE VALL VALVE ( JIS & ANISI & DIN) |
MINI BALL VALVE | BIBCOCK VALVE | GATE VALVE |
GLOBE VALVE | SWING CHECK VALVE | 1PC SPRING VERTICAL CHECK VALVE |
2PC SPRING VERTICAL CHECK VALVE | 3PC SPRING VERTICAL CHECK VALVE | Y-STRAINER |
If you need more ,please contact us. |
Customers' drawings or designs are available.
FAQ
1. Q: How about trade terms ?
A: FOB, CFR, CIF will be accepted.
2.What are your major products?
A:We mainly dealing with Pipe, Ball Valve, Post Spike etc.
3.Q:Can I get some samples?
A:We can offer the samples free but you need paid the freight cost by yourself.
4.Q: Can you supply the threaded treatment pipe Fittings end ?
A: Yes, We can supply threaded and coupled end treatment.
5.Q:What kind of payment is accepted?/ How about the payment terms?
A:T/T , L/C etc
6.Q:How about the delivery time?
A: New production:Need about 15-40 days after receiving your down payment or L/C.
Stock: After your down payment ,we will deliver within about 7days.